Custom test equipment & instrument manufacturing (OEM/ODM)

Contract manufacturing for custom test equipment, test systems and instruments — from requirement analysis and DFM/NPI to prototype validation, low-volume and production. Verifiable delivery at every step; in-house MES supports production transparency and traceability.

Capability matrix

Custom test equipment

ATE / FCT / burn-in / environmental reliability / air-tightness / vision / RF / power & battery test equipment built to your requirements, including test software and data acquisition.

Instrument OEM/ODM

Custom manufacturing of sensors, transmitters, DAQ, display & control instruments and calibration sources; private-label and co-design supported.

Test system integration

Test-station integration, host software and DAQ integration, motion control, signal conditioning and embedded development.

Calibration & maintenance

Metrological traceability, calibration stations, spare parts and scheduled maintenance to keep test assets available long-term.

Engagement models

OEM

Built to your specifications and drawings under your brand; process documents ship with the contract, IP in writing.

ODM

We design and manufacture while you focus on the market; design-file and source-code licensing scoped by contract.

Joint development

Co-engineering with your team (DFM feedback up front); review records and change history kept by both sides.

Low-volume to production

Fast prototyping, prototype validation, production ramp-up; multi-variety low-volume and closed-loop ECOs are our daily work.

Delivery process: from requirements to maintenance

Inputs, outputs and your sign-off points at each step.

S1

Requirement analysis

1–2 weeks

Test-requirement interviews: DUT parameters, cycle time, pass criteria, data interfaces; we will say so directly if it is not a fit.

Test requirement specification

S2

Test architecture

1–2 weeks

Test architecture, BOM selection, software framework and acceptance criteria.

Test plan & quotation

S3

DFM / NPI

2–4 weeks

Manufacturability analysis, NPI plan, key processes and supply-chain confirmation.

DFM report & NPI plan

S4

Prototype

4–10 weeks

Build-up and debugging, test-software development, on-machine validation.

Prototype acceptance record

S5

Validation

By product

Repeatability/capability validation, environmental and burn-in testing, third-party metrology if required.

Validation report & calibration certificate

S6

Low-volume

By product

Low-volume production with process-capability confirmation and closed-loop ECOs.

Batch quality documentation package

S7

Production

Ongoing

Rolling scheduling, incoming and outgoing inspection, periodic reviews.

Monthly quality & delivery report

S8

Maintenance

Ongoing

Spare parts, calibration-cycle management, remote and on-site support.

Maintenance & calibration ledger

Quality & calibration

Deliverables and batch documents at each stage — written into the contract before signing.

Quality stage × documents & records
Quality stagePracticeDelivered documents
Quality systemThree-level flow: incoming inspection, in-process patrol, outgoing inspection; system documents and certificate list available on request (confirmed before signing)Inspection flow & record templates
Metrological traceabilityCalibration stations follow national metrology procedures; values traceableCalibration certificates & traceability chain
Burn-in & environmental testingBurn-in room / thermal cycling / vibration per acceptance criteriaTest records & curves
Pre-scan EMCPre-scan before accredited lab runs to reduce certification risk (formal certification by accredited bodies)Pre-scan report
Process traceabilityPer-unit records for critical parts and operations (supported by our in-house MES)Per-unit traceability file

Cases & verifiable references

Case details are organised by test type and instrument category; verifiable references available on request. Trade & compliance: export procedures and origin documentation follow standard processes under agreements such as RCEP; applicable tariff treatment is determined by customs rulings. We do not promise tariff exemption or guaranteed lead times.

FAQ

How are lead times calculated?

Quoted and scheduled per stage (S1–S8); binding lead times are in the contract. This page is not a lead-time commitment.

How are drawings and IP protected?

NDA first; drawings and commercial information are used for evaluation only. IP ownership and licensing are defined in writing.

Can we stop after prototyping?

Yes. Each stage S1–S5 can end independently; prototype acceptance is a valid conclusion.

Do you support factory audits?

Yes, on-site or remote audits of production, inspection and traceability; please book in advance.

How are calibration cycles managed?

Calibration cycles are set per equipment category and managed in a ledger, with proactive reminders before expiry.

What is the minimum volume?

Evaluated per product; ramp-up from single digits to hundreds of units is common, subject to review conclusions.

Submit your test requirement, book an NPI review

Describe the DUT and test needs (drawings PDF/STEP welcome); we reply with an architecture feedback and a quotation range within 2 business days.

Drawings and commercial information are used for this evaluation only and are not shared before an NDA is signed.